New Bintulu-2 275 (132)kV Substation Establishment, Sarawak Malaysia
Timeline: 36 Months
Project Details: Construction of a 275kV GIS Switching Station
Establishment of New PMU 132/33kV Financial Centre GIS and Extension of Two (2) Overhead Lines Bays at PMU 132kV Gelang Patah, Malaysia
Timeline: 17 Months
Project Details: Construction of a 132kV GIS Substation and 2 bays Extension Work at remote end 132kV AIS Substation
500/275kV Yong Peng East (2x1050MVA), Johor, Malaysia
Timeline: 36 Months
Project Details: Construction of 5 diameter of 500kV AIS Substation
Engineering, Procurement and Construction of West 132kV Substation Project , Kulim Hi-Tech Park, Kedah, Malaysia
Timeline: 16 Months
Project Details: Construction of 10 Bays 132kV AIS Substation for private utility
EPC Work Package for 275kV Substation, Ferro Alloy Project Samalaju, Sarawak, Malaysia
Timeline: 23 Months
Project Details: Construction of a 275kV AIS Main Intake Substation with 35kV SVC and 11kV capacitor bank
Sakura Ferroalloys Project 132/33/11kV, Samalaju Industrial Park Sarawak, Malaysia
Timeline: 19 Months
Project Details: Construction of a 132kV, 33kV and 11kV AIS Substation
Mambong & Entinggan 275kV Substation Extension Project, Sarawak, Malaysia
Timeline: 16 Months
Project Details: Construction of 275kV and 132kV C-type Filter Capacitor Banks
PMU 275/132kV Permas Jaya Extension (2 x 275kV OHL Feeders), Johor, Malaysia.
Timeline: 25 Months
Project Details: Construction of a 275kV GIS Switching Station
Turnkey Contract to Design, Supply, Construct, Testing and Commissioning A Single Feeder AIS 132kV Substation for Malaysian Newsprint Industries (MNI), Pahang, Malaysia
Timeline: 8 Months
Project Details: Construction of 132kV & 33kV AIS Substation
The Design, Manufacturer, Supply, Delivery, Installation, Testing & Commissioning of The Additional 2 x 45MVA 132/33kV Transformer at Sandakan & Tawau Main Intake Substation and Other Related Works, Sabah, Malaysia
Timeline: 18 Months
Project Details: Construction of 132kV AIS Transformer Bays
Murum Junction 275/33kV Substation, Bintulu, , Malaysia
Timeline: 27 Months
Project Details: Construction of 275kV AIS Substation
90/11kV Seguela Grid Connection Project, Ivory Coast, Africa
Abujar Gold Mine 90kV Grid Connection Project, Ivory Coast, Africa
Daloa 90kV Grid Connection Project, Ivory Coast, Africa
66/11kV Kila Kila Substation, Port Moresby, Papua New Guinea
300/600MW HVDC from Gurun to Bukit Kayu Hitam, Kedah, Malaysia
Route Length : 95km
275kV DC TL from Miri to Bintulu, Sarawak, Malaysia
Route Length : 196km
132kV DC TL from Kuantan to Pekan, Pahang Malaysia
Route Length : 50km
275 & 132kV DC TL LILO into Metacorp from Air Keroh – Tangkak , Malaysia
Route Length : 15km
132kV DC TL from Bukit Sentosa to Europlus Zone 4, Selangor , Malaysia
Route Length : 7km
Normalization 500/275kV DC TL at Junjung, Kedah, Malaysia
Route Length : 2km
275/132kV DC TL Relocation Works at Kg Pandan, Kuala Lumpur , Malaysia
Route Length : 2.5km
33kV ABC & UGC from PMU Gebeng Industri to 10MW Petronas Solar Plant, Pahang, Malaysia
Route Length : 6km
33kV TL from Lambir to Marudi, Sarawak, Malaysia
Route Length : 67km
66kV DC TL Kila Kila Substation to T-Off Rauna, Papua New Guinea
Route Length : 6km
275kV DC Oil Filled UGC from Pudu Ulu – Galloway, KL, Malaysia
Route Length : 6km
132kV XLPE DC UGC LILO at PMU Kota Damansara, Selangor, Malaysia
Route Length : 5km
132kV XLPE DC UGC from PMU Tg Agas to STME, Johor, Malaysia
Route Length : 2.3km
275kV XLPE DC UGC at RAPID Project, Johor, Malaysia
Route Length : 4.5km
275kV XLPE DC UGC at PMU Yong Peng East, Johor, Malaysia
Route Length : 0.5km
275kV XLPE DC UGC at PMU Olak Lempit, Selangor, Malaysia
Route Length : 0.6km
275kV XLPE DC UGC at PMU Junjung, Kedah, Malaysia
Route Length : 0.5km
ELECTRICAL SUBSTATION
Voltage Level : 33kV up to 500kV
SCOPE
Electrical :
- Single Line Diagram
- Switchyard Design
- Primary Equipment Design
- Secondary Equipment Design
- Telecontrol & Teleprotection Design
- SCADA
- Earthing System Design
- Cable Schedule
Civil :
OVERHEAD TRANSMISSION LINE
Voltage Level : 33kV up to 500kV
SCOPE
UNDERGROUND CABLE TRANSMISSION LINE
Voltage Level : 11kV up to 275kV