Key Personnel Projects

⁠Explore our 30 years of key personnel projects

Our Highlighted Projects

New Bintulu-2 275 (132)kV Substation Establishment, Sarawak Malaysia

Timeline: 36 Months
Project Details: Construction of a 275kV GIS Switching Station

Establishment of New PMU 132/33kV Financial Centre GIS and Extension of Two (2) Overhead Lines Bays at PMU 132kV Gelang Patah, Malaysia

Timeline: 17 Months
Project Details: Construction of a 132kV GIS Substation and 2 bays Extension Work at remote end 132kV AIS Substation

500/275kV Yong Peng East (2x1050MVA), Johor, Malaysia

Timeline: 36 Months
Project Details: Construction of 5 diameter of 500kV AIS Substation

Engineering, Procurement and Construction of West 132kV Substation Project , Kulim Hi-Tech Park, Kedah, Malaysia

Timeline: 16 Months
Project Details: Construction of 10 Bays 132kV AIS Substation for private utility

EPC Work Package for 275kV Substation, Ferro Alloy Project Samalaju, Sarawak, Malaysia

Timeline: 23 Months
Project Details: Construction of a 275kV AIS Main Intake Substation with 35kV SVC and 11kV capacitor bank

Sakura Ferroalloys Project 132/33/11kV, Samalaju Industrial Park Sarawak, Malaysia

Timeline: 19 Months
Project Details: Construction of a 132kV, 33kV and 11kV AIS Substation

Mambong & Entinggan 275kV Substation Extension Project, Sarawak, Malaysia

Timeline: 16 Months
Project Details: Construction of 275kV and 132kV C-type Filter Capacitor Banks

PMU 275/132kV Permas Jaya Extension (2 x 275kV OHL Feeders), Johor, Malaysia.

Timeline: 25 Months
Project Details: Construction of a 275kV GIS Switching Station

Turnkey Contract to Design, Supply, Construct, Testing and Commissioning A Single Feeder AIS 132kV Substation for Malaysian Newsprint Industries (MNI), Pahang, Malaysia

Timeline: 8 Months
Project Details: Construction of 132kV & 33kV AIS Substation

The Design, Manufacturer, Supply, Delivery, Installation, Testing & Commissioning of The Additional 2 x 45MVA 132/33kV Transformer at Sandakan & Tawau Main Intake Substation and Other Related Works, Sabah, Malaysia

Timeline: 18 Months
Project Details: Construction of 132kV AIS Transformer Bays

Murum Junction 275/33kV Substation, Bintulu, , Malaysia

Timeline: 27 Months
Project Details: Construction of 275kV AIS Substation

90/11kV Seguela Grid Connection Project, Ivory Coast, Africa

Abujar Gold Mine 90kV Grid Connection Project, Ivory Coast, Africa

Daloa 90kV Grid Connection Project, Ivory Coast, Africa

66/11kV Kila Kila Substation, Port Moresby, Papua New Guinea

300/600MW HVDC from Gurun to Bukit Kayu Hitam, Kedah, Malaysia

Route Length : 95km

275kV DC TL from Miri to Bintulu, Sarawak, Malaysia

Route Length : 196km

132kV DC TL from Kuantan to Pekan, Pahang Malaysia

Route Length : 50km

275 & 132kV DC TL LILO into Metacorp from Air Keroh – Tangkak , Malaysia

Route Length : 15km

132kV DC TL from Bukit Sentosa to Europlus Zone 4, Selangor , Malaysia

Route Length : 7km

Normalization 500/275kV DC TL at Junjung, Kedah, Malaysia

Route Length : 2km

275/132kV DC TL Relocation Works at Kg Pandan, Kuala Lumpur , Malaysia

Route Length : 2.5km

33kV ABC & UGC from PMU Gebeng Industri to 10MW Petronas Solar Plant, Pahang, Malaysia

Route Length : 6km

33kV TL from Lambir to Marudi, Sarawak, Malaysia

Route Length : 67km

66kV DC TL Kila Kila Substation to T-Off Rauna, Papua New Guinea

Route Length : 6km

275kV DC Oil Filled UGC from Pudu Ulu – Galloway, KL, Malaysia

Route Length : 6km

132kV XLPE DC UGC LILO at PMU Kota Damansara, Selangor, Malaysia

Route Length : 5km

132kV XLPE DC UGC from PMU Tg Agas to STME, Johor, Malaysia

Route Length : 2.3km

275kV XLPE DC UGC at RAPID Project, Johor, Malaysia

Route Length : 4.5km

275kV XLPE DC UGC at PMU Yong Peng East, Johor, Malaysia

Route Length : 0.5km

275kV XLPE DC UGC at PMU Olak Lempit, Selangor, Malaysia

Route Length : 0.6km

275kV XLPE DC UGC at PMU Junjung, Kedah, Malaysia

Route Length : 0.5km

ELECTRICAL SUBSTATION

Voltage Level : 33kV up to 500kV

SCOPE

Electrical :

  • Single Line Diagram
  • Switchyard Design
  • Primary Equipment Design
  • Secondary Equipment Design
  • Telecontrol & Teleprotection Design
  • SCADA
  • Earthing System Design
  • Cable Schedule

Civil :

  • Control Building Design
  • Foundation & Piling Design
  • Road & Drainage Design
  • M&E Design
  • Sewerage System Design
  • Slope Protection Design
  • OVERHEAD TRANSMISSION LINE

    Voltage Level : 33kV up to 500kV

    SCOPE

  • Route and Profile Survey
  • Drone Survey
  • Soil Investigation
  • Tower Spotting using PLS CADD
  • Tower Design using PLS TOWER
  • Monopole Design using PLS POLE
  • Foundation Design & Calculation
  • Sag Tension Chart & Calculation
  • Foundation Testing Design & Calculation
  • Earthing System Design & Calculation
  • Slope Protection Design & Calculation
  • UNDERGROUND CABLE TRANSMISSION LINE

    Voltage Level : 11kV up to 275kV

    SCOPE

  • Route and Profile Survey
  • Utility Mapping
  • Soil Resistivity / Thermal Investigation Design
  • Cable System Design & Simulation using CYMCAP
  • Single Line Diagram
  • Cable Earthing / Bonding System Design
  • Cable System Fault Analysis
  • Cable Pulling Arrangement & Design